ICS Weekly Report: September 18, 2020

Sheridan Hills Elementary students learn during a field trip to Wood Lake Nature Center
ICS Weekly Report: September 18, 2020

Each week, we will share the latest construction updates provided by ICS. If you would like to view past updates or learn more about our capital facilities plan, please visit the Facilities page. 


*This report is submitted from ICS on a weekly basis.

Richfield High School

Completed week ending Friday, September 18, 2020

  • General
    • Punch list and interior room signage installed
    • Testing, balancing, and commissioning of mechanical systems
  • Boiler Room
    • Exhaust piping
  • Area P Link
    • Temporary window conditions to addressed
    • Painting throughout
  • Lower Level Area F Dance Studio and Weight Room
    • Flooring installation continued
    • Installation of mechanical diffusers and electrical finishes in multipurpose rooms
  • Area C 3rd level science rooms
    • Plumbing rough ins near completion
  • Area C 3rd level restrooms
    • Plumbing rough ins near completion
  • New Athletic Corridor/Elevator
    • Roofing continued and interior wall framing continued
    • Demolition of exterior wall
  • Exterior Work
    • Sod and landscaping throughout

Planned week ending Friday, September 25, 2020

  • General
    • Punch list
    • Testing, balancing, and commissioning of mechanical systems
  • Boiler Room
    • Mechanical connections to continue
  • Area P Link
    • Window prep
  • Lower Level Area F Dance Studio and Weight Room
    • Finish dance studio flooring
    • Flooring installation in multipurpose rooms
  • Area C 3rd level science rooms
    • Gyp board install to begin
  • Area C 3rd level restrooms
    • Gyp board install to begin
  • New Athletic Corridor/Elevator
    • Floor slab to be poured
    • Interior wall framing
    • Elevator work
  • Exterior Work
    • Sod and landscaping throughout

Centennial Elementary

Completed week ending Friday, September 18, 2020

  • Contractors worked to complete punchlist items.
  • Continued testing and balancing of the building mechanical/HVAC systems.
  • Contractors corrected issues noted on the IEA Commissioning corrective action log.
  • Continued working on boiler piping.

Planned week ending September 25, 2020

  • Contractor to continue working to address punchlist items.
  • Contractor to continue working through testing and balancing of the mechanical/HVAC equipment.
  • Continue boiler room piping efforts.
  • All State to continue installing security system components.

Sheridan Hills Elementary

Completed week ending Friday, September 18, 2020

  • Began the exterior brick at the front entry addition.
  • Completed the installation of the tackable wall covering in the Front Entry corridor.
  • Continue Phase 2 mechanical piping in the Lower Level.
  • New boilers were set on their respective housekeeping pads.
  • All State to continued installing security system components.
  • Completed sodding adjacent to the Front Entry addition.

Planned week ending Friday, September 25, 2020

  • Complete the brick at the Front Entry addition.
  • Contractor to continue working to address punchlist items.
  • Contractor to continue working through testing and balancing of the HVAC/mechanical equipment.
  • Continue Phase 2 mechanical piping in the Lower Level.
  • All State to continue installing security system components.

Richfield Middle School

Completed week ending Friday, September 18, 2020

  • Phase 1 punch list work continued
  • Phase 2 Area D Special Education/Link
    • Mechanical and electrical rough ins for new Special Education classrooms
    • Demolition of restrooms
  • Phase 2 New Conference Room and Staff Lounge
    • Gypsum Board Drywall Installed
    • Mechanical and electrical rough ins

Planned week ending Friday, September 25, 2020

  • Phase 1 punch list
    • Remaining Media Center to be delivered and installed
    • Media Center books to be delivered and installed
  • Phase 2 Area D Special Education/Link
    • Gypsum Board installation for classrooms
    • Prep for tile work in restrooms
  • Phase 2 New Conference Room and Staff Lounge
    • Start mudding and taping wall finishes

Richfield STEM Elementary

Completed week ending Friday, September 18, 2020

  • Testing, balancing, and commissioning of mechanical systems
  • Completed punch list – Tackable Wall Covering
  • Boiler room work and installation of exterior door

Planned week ending Friday, September 25, 2020

  • Testing, balancing, and commissioning of mechanical systems
  • Boiler room work oil piping and exhaust ductwork

Richfield Dual Language School

Completed week ending Friday, September 18, 2020

  • ICS Commissioning continued performing the commissioning of the building’s mechanical and HVAC systems.
  • Contractors continued working to address items noted on the commissioning corrective action log.

Planned week ending Friday, September 25, 2020

  • ICS Commissioning to continue performing the commissioning of the building’s mechanical and HVAC systems.
  • Contractors to continue working to address items noted on the commissioning corrective action log.

Download the PDF Report

Read More

2023 graduate holding diploma

The Minnesota Department of Education released the 2023 graduation rates. We are excited to share that we have made consistent gains in many areas and that Richfield High School’s four-year graduation rate (94.1%) exceeds the statewide graduation rate of 83.3% by 10.8 percentage points. 

Empty Bowls Fundraiser: You're Invited

You’re invited to join us from 5-6:30 p.m. on Tuesday, March 12, for the Empty Bowls fundraiser. Empty Bowls is an event celebrating our community through art, music and food!